calendar>>March 7. 2011 Juch 100 |
New Dam Building Method Developed
|
|
Pyongyang, March 7 (KCNA) -- The construction of the Huichon Power Station in the northern part of the DPRK is progressing apace by dint of new construction methods. One of them is a method of prefab dam building. Non-reinforced prefabricated concrete parts of different shapes have been made for the dam project. This method makes it possible to build the dam at a high speed and in a simple way and ensure continuous concrete tamping, with less materials and manpower. |
Copyright (C) KOREA NEWS SERVICE(KNS) All Rights Reserved.
|