calendar>>January 6. 2022 Juche 111
Hydro-power Stations of DPRK Increase Electricity Output
Pyongyang, January 6 (KCNA) -- Large-scale hydro-power stations in South Hamgyong Province of the DPRK launched a vigorous drive for increased production to implement the decisions of the 4th Plenary Meeting of the 8th Central Committee of the Workers' Party of Korea.

The Hochongang Power Station, with full preparations made for winter electricity production, is honoring its daily quota. Its workers have rationally operated generators according to their technical features and ensured high water level and high-efficiency operation to boost the electricity production.

The Jangjingang Power Station put the control of water level on a scientific basis and established a real-time efficiency-measuring system, while the Pujongang Power Station directed efforts into securing water and managing hydraulic structure to show good production results from the beginning of the year.

The Kumyagang Army-People Power Station settled the problems arising in the operation of generators on its own while reducing the level of electricity consumption.

Copyright (C) KOREA NEWS SERVICE(KNS) All Rights Reserved.