calendar>>October 28. 2024 Juche 113 |
Progress Made in Power Sector
|
|
Pyongyang, October 28 (KCNA) -- The Pyongyang Thermal Power Plant in the DPRK completed the assembly of turbogenerator No. 8 and successfully conducted its test operation. Workers and technicians of the turbine repair shop successfully carried out the unburdened test by assembling parts of the turbine body in a responsible manner. Those of heat production shops and the chemical shops contributed to establishing such processes as the composition of lubricant and cooling water systems. |
Copyright (C) KOREA NEWS SERVICE(KNS) All Rights Reserved.
|